Secondary School No.4 in Masazyr settlement

  • Project
  • Photo

Secondary School No.4 in Masazyr settlement  of the Absheron district has been constructed with the support of the Heydar Aliyev Foundation. Construction of the school started in 2015. On October 6, 2016, Azerbaijan’s First Lady, President of the Heydar Aliyeva Foundation Mehriban Aliyeva and Vice-president of the Foundation Leyla Aliyeva attended the opening of the school.

 

Designed for 800 pupils, the school building is three-storied. The school accommodates 36 classrooms, a buffet, a sports hall with total area of 600 square metres, a 360-seat assembly hall, various subject laboratories, including military training, biology, physics, IT laboratories, chemistry laboratory and a library.

 

Extensive improvement works have been done in the school’s yard, verdure laid out, and an illumination system installed.

 

38 teachers will be engaged in educating pupils studying in Azerbaijani and Russian sections. 



1.JPG
2.JPG
3.JPG
4.JPG
5.JPG
6.JPG
7.JPG
8.JPG
14.JPG
19.JPG