06.jpg
September 15, 2020

Education institutions constructed and basically repaired by the Heydar Aliyev Foundation in Tovuz, Gazakh, Salyan and Neftchala districts are inaugurated

The Heydar Aliyev Foundation has always kept the sphere of education on the focus of attention, contributing to the advancement of education by implementing various projects and programmes in this sphere.   

 

Tovuz

 

On September 15th, inauguration of the Kohnegala village secondary school named after S.I.Khatai, constructed with the support of the Heydar Aliyev Foundation, took place after basic repair. 

 

Participating in the event, Education Minister Emin Amrullayev and representative of the Heydar Aliyev Foundation Jeyhun Aslanov visited first the monument erected to national leader Heydar Aliyev in the park named after the National Leader. 

 

Then, acquaintance with the school building followed. It was informed that the building of Kohnegala village secondary school, commissioned din 1980, had fallen into disrepair and was in an emergency state. The new building of the school, designed for 624 pupils, was constructed by the Heydar Aliyev Foundation. The school complex is two-storied, consisting of four buildings.  The school has been provided with necessary furniture and equipment, with subject rooms and laboratories being equipped with visual aids. The school building accommodates 27 classrooms, laboratories for physics, chemistry and biology, informatics, military training and first aid rooms, labour training rooms for girls and boys, a library, a canteen, an assembly hall, a sports hall and open-air sports ground. 

 

Improvement and greenery planting works were performed on the school’s territory. 

 

While inaugurating the secondary school named after A. Gasymov in Tovuz city after basic repair, it was brought to attention that the school had been constructed 90 years ago and fallen into disrepair. 

 

Repaired with the support of the Heydar Aliyev Foundation, the 624-pupil school building was commissioned on September 15th. The school consists of a three-storied education building, and a sports hall. The school has been provided with necessary furniture and equipment, and subject rooms and laboratories with visual aids. There are 21 classrooms, laboratories for physics, chemistry and biology, rooms for informatics, military training and first aid, labour training rooms for girls and boys, a library, a canteen, and an assembly hall, as well as a sports hall on the school’s territory. Improvement and greenery planting works were performed in the school yard. 

 

Thereafter, a ceremony of commissioning the Dondar Gushchu village secondary school, Tovuz district, after basic repair, took place. 

 

It was informed that the two-storied building of the secondary school, constructed in 1984, had worn out physically over the course of past years. 

 

Construction of the school, designed for 620 pupils, started in late 2019 by the Heydar Aliyev Foundation. The repair works were finished in August 2020. Total area of the school is 1.5 hectares. 

 

The two-storied school building accommodates classrooms, physics, chemistry and biology laboratories, an informatics room, military training, first aid and labour training rooms, a library, a canteen, an assembly and sports halls. The school rooms have been provided with necessary furniture and equipment.

 

Improvement and greenery planting works were carried out on the school’s territory, asphalt and grass-plot were laid, and decorative shrubs and trees planted. 

 

Gazakh

 

On the same day, the Kosalar village secondary school named after Ismail Shykhly, Gazakh district, was commissioned after basic repair. 

 

First, the monument to national leader Heydar Aliyev in the park named after the National Leader in Gazakh city was visited.

 

While becoming familiar with the new building of the Kosalar village secondary school was informed that the school was built in 1987. There arose a need for basic repair in the building as a result of physical wear out. 

 

Basic repair works by the Heydar Aliyev Foundation started in the school building, designed for 1176 pupils, in late June 2019. The basic repair works were finished in late June 2020.  The school consists of two buildings. The first building is three-storied, while the second one is two storied. The school building has been provided with necessary furniture and equipment, with the subject rooms and laboratories being equipped with visual aids. 

 

The are 30 classrooms, physics, chemistry and biology laboratories, 2 informatics rooms, a military training, first aid and labour training rooms, an electronic library, an assembly hall, a sports hall, two open air sports grounds and a wrestling hall.

 

Salyan

 

A new school building was commissioned in Kurkend village of Salyan district. Constructed with the support of the Heydar Aliyev Foundation, the school building is designed for 360 pupils. 

 

Director of the school Sitara Tahmazova informed that the one-storied Ashaghy Kurkend secondary school named after Azer Aliyev was built in 1949. Over the course of previous years, the school building warn out physically, falling into emergency state. Although current repair works were conducted recent years, it did not meet modern standards. Lack of normal heating and illumination systems had a negative impact on the teaching process. 

 

Taking into account the abovementioned, the Heydar Aliyev Foundation constructed a new building for 360 pupils. The three-storied school complex consists of three buildings. The school has been provided with necessary furniture and equipment, with subject rooms and laboratories being equipped with visual teaching aids. The building, intended for 360, has 20 classrooms, laboratories for physics, chemistry and biology, informatics, military training and first aid rooms, labour training rooms for girls and boys, a library, a canteen, an assembly hall, a sports hall, and open-air sports ground. Improvement and greenery planting works were carried out in the school’s yard. 

 

Representatives of the Heydar Aliyev Foundation, as well as employees of the district executive authority attended the opening of the school building. They became familiar with the newly commissioned building, met with pupils, giving them gifts comprised of teaching aids. 

 

The school headmaster thanked President Ilham Aliyev and First Lady, President of the Foundation Mehriban Aliyeva on behalf of the staff and parents for the care and attention shown, and for the new building constructed for the school. 

 

Another education establishment constructed and commissioned in Salyan is Salyan city Nursery-kindergarten No.9. 

 

Constructed in 1975, the kindergarten operated in an adapted building. The Heydar Aliyev Foundation constructed and commissioned a new building for the nursery-kindergarten, of which building had fallen into disrepair. 

 

Principal of the kindergarten Puste Hajiyeva noted that previously, the building where children were educated was meant for 40 children. There used to be some hardships due to the building’s being old. Considering this, the Heydar Aliyev Foundation built a new two-storied building for 60 children. The kindergarten boasts sleeping and play rooms, sports and music halls, a kitchen, a canteen, a warehouse, a first aid room, a laundry, and other administrative and technical rooms.

 

The kindergarten has been provided with necessary furniture and equipment. Improvement and greenery planting work were performed in the kindergarten’s yard. 

 

The conditions created in the newly commissioned building were viewed. 

 

Neftchala

 

Basically repaired by the Heydar Aliyev Foundation, Secondary School No.1 named after Rafiq Gozalov in Khylly settlement, Neftchala district, was commissioned on September 15th

 

School headmaster Jamaleddin Gozalov informed that the school’s building was constructed in 1988, and was in an emergency condition. As the building’s service term had expired, there were hardships also in terms of heating system. Because the illumination system was poor, it created problems in the teaching. Considering this, the Heydar Aliyev Foundation carried out basic repair of the building. The school complex consists of 4 buildings. The school has been provided with necessary furniture and equipment, with subject rooms and laboratories being equipped with visual teaching aids. 

 

Meant for 864 pupils, the school building boasts 38 classrooms, laboratories for physics, chemistry and biology, two informatics room, military training, first aid and labour training rooms, a library, a canteen, an assembly hall, and an open-air sports ground. Improvement and greenery planting works were performed in the school’s yard. 

 

The conditions created in the commissioned school building were viewed.  The school headmaster thanked President Ilham Aliyev and President of the Heydar Aliyev Foundation Mehriban Aliyeva on behalf of the school staff and residents of the settlement for the conditions created in the education establishment. 

 

Resident of Khylly settlement Rauf Aliyev too underscored that the basic repair conducted in the school building is an obvious example of steps made in the country towards augmenting the education infrastructure. He noted that the old building had a negative impact on education. “Nonetheless, pupils of the settlement will now study in a basically repaired school building. This will make its positive contribution to education. We thank all who have made their contribution to this work”, - he said.


PHOTO